☰

Awa Manneh — Behind Schedule (Can I Get A Witness) songtekst en vertaling

De pagina bevat de songtekst en de Nederlandse vertaling voor het nummer "Behind Schedule (Can I Get A Witness)" van Awa Manneh.

Songteksten

Can I Get A Witness
I’ve Been Doing This Since Way Back
Can I Get A Witness
Are We Not Always On The Wrong Track
Can I Get A Witness
To Testify That You And I Are Through
Now Love’s Been on The Low Low I’ve Got Some Catching Up To Do
(So Me Say)
Baby It’s You Taking Up Time Leaving Me Behind Schedule
Now I’ve Got Some Catching Up To Do
It’s You Taking Up My Time
Leaving Me Behind Schedule
Now I’ve Got Some Catching Up To Do
Can I Get A Witness
I’m No Rookie In The Game Of Love
Can I Get A Witness
Playing Has Been Mostly With You
Can I Get A Witness
To Testify I Feel So Much Better Now
Now Love’s Been In The Low Low I’ve Got Some Catching Up To Do
(So Me Say)
Wanna Testify Everything’s In Order
Wanna Spread The Word Right Across The Border
Wanna Tell You That Everything Is Quite Allright
Letting Go Of You Is Gonna Make Me Wanna Sleep All Night

Songtekstvertaling

Kan Ik Een Getuige Krijgen?
Ik doe dit al sinds lang.
Kan Ik Een Getuige Krijgen?
Zitten We Niet Altijd Op Het Verkeerde Spoor?
Kan Ik Een Getuige Krijgen?
Om Te Getuigen Dat Jij En Ik Klaar Zijn.
Nu is de liefde op het dieptepunt. ik heb wat in te halen.
(Dat Zeg Ik)
Jij neemt de tijd in beslag en laat Me achter op schema.
Nu heb ik wat in te halen.
Jij neemt mijn tijd in beslag.
Laat Me Achter Op Schema.
Nu heb ik wat in te halen.
Kan Ik Een Getuige Krijgen?
Ik ben geen groentje in het spel van de liefde.
Kan Ik Een Getuige Krijgen?
Spelen Is Meestal Met Jou
Kan Ik Een Getuige Krijgen?
Om Te Getuigen Voel Ik Me Nu Veel Beter.
Nu is de liefde in het laagste Dal ik heb wat in te halen
(Dat Zeg Ik)
Ik wil getuigen dat alles in orde is.
Wil Het Woord Verspreiden Over De Grens
Ik Wil Je Zeggen Dat Alles In Orde Is.
Door Je Los Te Laten Wil Ik De Hele Nacht Slapen.